Roofing example

Roof replacement estimate for an office building

Acme Roofing & Solar is a made-up business, but everything in this report is real output: the shapes were drawn on satellite imagery in Satellite Area, and the report builder added the measurements, Google terrain and roof data, the priced estimate and the written summary. Nothing below was edited by hand except the notes and photos.

September 21, 2026

Roof replacement estimate: office building

408A US-79, Hutto, TX 78634, USA

Total area10,201 sq ft
Roof surface9,792 sq ft20 roof segments
Estimated total$53,744.50Roofing, labor and other items; tax included
Prepared for
Lone Star Office Partners
Suite 200, 101 Main St, Hutto, TX
facilities@lonestaroffice.example
Prepared by
Acme Roofing & Solar
(512) 555-0119
estimates@acmeroofing.example
Quote
No. Q-260921-R42
Valid until October 21, 2026
Purpose
Roof replacement estimate for an office building, with notes on solar readiness

Summary

Prepared for Lone Star Office Partners, this roof replacement estimate covers the office building at 408A US-79, Hutto, TX 78634, USA. The main roof measures 10,201 sq ft with a 425 ft perimeter. Roofing materials are based on 110 roofing squares, 330 shingle bundles, and 43 pieces of drip edge. The estimated total, including labor, disposal, dumpster and permit, and tax, is $53,744.50.

The roof layout is relatively complex for replacement work, with Google Solar data identifying 9,792 sq ft across 20 roof segments. The listed planes include broad low-slope north-facing roof surface at 1/12, substantial south-facing planes at 7/12 and 6/12, and smaller east-, west-, and north-facing areas. The 11/12 north-facing plane and the many smaller roof planes will require careful staging, transitions, flashing, and detail work. Ridge, valley, edge-metal, and shingle tie-in quantities should be field-verified before ordering.

Solar planning can be coordinated with the reroof. The south-facing 7/12 and 6/12 planes are the primary panel-ready areas, while the east- and west-facing planes may also support panels depending on site conditions. The solar estimate indicates room for up to 313 panels, 125.2 kW at 400 W each, about 201,163 kWh a year, and 1,807 sun hours a year. Completing roofing, flashing, and any needed structural review before panel installation will help avoid removing and reinstalling solar equipment later.

Map overview

  1. 1Main roof10,201 sq ft

Roof and solar

Roof surface area9,792 sq ft

Measured by Google's Solar data for the building nearest the first area on the map, across 20 roof segments. This is the sloped surface of the roof, not its footprint on the ground.

Roof planes, largest first
#AreaPitchFaces
12,568 sq ft1/12north
22,185 sq ft7/12south
31,723 sq ft6/12south
4429 sq ft7/12west
5418 sq ft7/12east
6393 sq ft6/12north
7340 sq ft6/12north
8336 sq ft5/12north
9254 sq ft6/12north
10173 sq ft3/12north
11170 sq ftflatnorth
12150 sq ft11/12north
and 8 smaller planes (652 sq ft together)
Solar capacity125.2 kW

Google estimates room for up to 313 panels of 400 W, producing about 201,163 kWh a year before system losses. The sunniest parts of the roof get 1,807 hours of sun a year. A solar installer should confirm the layout.

Measurements

#ShapeTypeAreaPerimeter or length
1Main roofArea10,201 sq ft425 ft

Materials and cost estimate

Roofing
ItemQuantityUnit priceTotal
Roofing squares110 squares$96.00$10,560.00
Shingle bundles330 bundles$41.00$13,530.00
Drip edge43 pieces$9.50$408.50
Roofing subtotal$24,498.50

Assumes waste 12%, bundles per square 3, drip edge piece length 10 ft, ridge cap per bundle 33 ft.

Labor and other items
ItemQuantityUnit priceTotal
Tear-off and disposal98 squares$85.00$8,330.00
Installation labor98 squares$165.00$16,170.00
Dumpster and permit1 each$650.00$650.00
Labor and other items subtotal$25,150.00
Subtotal
$49,648.50
Tax (8.25%)
$4,096.00

Estimated total$53,744.50

Quantities are rounded up for ordering. Prices are the preparer's.

Site photos

Reference: a completed commercial re-roof from the air.
Reference: a completed commercial re-roof from the air.
Reference: rooftop solar on a low-slope commercial roof.
Reference: rooftop solar on a low-slope commercial roof.

Observations and recommendations

  • Field-verify the 10,201 sq ft roof surface, 425 ft perimeter, all 20 roof segments, and the 8 smaller unlisted planes before final material ordering and crew scheduling.
  • Inspect roof decking after tear-off and before new installation; document any areas requiring repair so the roof substrate is sound for both roofing and potential solar loading.
  • Plan detailed flashing at every penetration, wall transition, valley, ridge, and roof-plane change, particularly where the 7/12, 6/12, 5/12, 3/12, 1/12, flat, and 11/12 areas meet.
  • Confirm that the 43 pieces of drip edge provide the intended edge treatment for the completed field-measured roof perimeter and all applicable eaves and rakes.
  • Review attic or roof-cavity ventilation and intake/exhaust paths during replacement so new roofing details do not restrict airflow.
  • If solar is anticipated, coordinate panel layout and attachment locations with the new roof installation, prioritizing the south-facing 7/12 and 6/12 planes and keeping penetrations compatible with the roofing warranty requirements.

Notes

Squares are priced for synthetic underlayment, ice and water shield at the valleys and ridge vent. Bundles are architectural shingles, 30 year.

The roof has many small planes and several penetrations, which is why we use 12% waste instead of our usual 10%.

If you are considering solar in the next few years, we recommend doing it right after the new roof so panels are not removed and reset later.

Work is scheduled in two phases so the building stays dry and open for tenants.

Disclaimer

Measurements are estimates made from satellite imagery for planning purposes. They are not a legal survey. Confirm critical dimensions on site or with a licensed surveyor before buying materials or making commitments.

Report made with satellitearea.com

Make one for your next job

Draw the site, pick a template, set your prices and logo. Your report is ready to send in about a minute.

More examples

Reference photos from Wikimedia Commons: Wikideas1 (CC0); Roy Bury (CC0). Businesses and clients are fictional. Places are real and used only as examples.